Dan’s attention to detail has served him well throughout more than two decades at BWBR. He specializes in projects that have highly technical requirements and logistical challenges such as intricate clean room environments, buildings with multiple uses that have complex zoning and code issues, and multi-phased additions/renovations. He provides hands-on management on total project design and documentation, effectively orchestrating collaboration between the in-house design team, engineering/specialty consultants, and contracting partners.
Dan Hottinger
Principal
651.290.1978
dhottinger@bwbr.com
Joined BWBR in 1998
Named Principal in 2021
“They say the devil is in the details, and I love the details. Delving into the projects to find things that need to be fixed, client needs that need to be reconciled to the building or a proper roof flashing all make a project go smoother when construction starts. We take pride in the quality of our work and our clients take pride in the final built solutions. The fact that the work comes from a place with a culture of quality and strong mentor-ship makes me proud to work at BWBR.”
Projects
Seagate TechnologyAdvanced Technology Group (ATG) Semiconductor Fabrication FacilityChurch of Saint PeterWestfields Hospital & Clinic
Emergency Department Expansion and RemodelingState of Minnesota
Minnesota Senate BuildingLeague of Minnesota Cities
Workplace RemodelCornell College
Russell Science CenterChippewa Valley Technical College
Transportation Education Center and Storage FacilitiesCornell College
West Science Hall Renovation
Presentations: